01

Historical delivery planning case

Six metrics from the 2025 project materials, with the original values and definitions. The run dates, sample size, baseline, and calculation methods still need verification. These results apply to the historical case and do not guarantee performance for the current product or other scenarios.

MetricOriginal figureMeaning and items to verify
Total transport cost−30%Combined transport resource and travel cost. Cost components, prices, and baseline are pending verification.
Late deliveries−80%On-time fulfillment. Delay threshold, counts, and reporting period are pending verification.
Total distance−47%Route and fleet usage. Route sample and distance calculation are pending verification.
Total delivery time−9.3%Delivery duration. Start and end points and inclusion of waiting are pending verification.
Vehicles used−18%Vehicles used for the sample. Fleet comparability and job volume are pending verification.
Empty-running rate−10.9%Fleet utilization. Whether it uses distance or time, and percent or percentage points, is pending verification.
Historical metrics pending verification

This case is separate from the Shanghai workbench screenshots and the Guangdong highway operations demo.

02

Shanghai workbench and Guangdong interactive demo

The vrp-1 workbench

Original workbench screenshots from 10 scenarios across 16 Shanghai districts, with 480 jobs and 80 resources. The maps and roads use public geography. The jobs and execution events are simulated.

Explore seven workbench views ↗

Guangdong interactive demo

The dark-theme demo uses a highway operations scenario to show planning, qualification trade-offs, replanning after a vehicle outage, and handoff. Plans are prepared in advance.

Try the agent demo ↗

03

Original award certificates

Open the original certificate to confirm the competition, project, year, and award grade.

04

Press and event coverage

Start with a concrete planning problem.

Contact the PsiAI team ↗